Indices showing realized electric energy transmission (2009)  

 
Main indices showing fulfillment of plan for transmission without data for Kosovo and Metohija
Energy in GWh
  2009.
Available 41.198
Transmission losses 1.106
Losses Rate (%) 2,68
Supply 40.092

The data for Kosovo and Metohija in 2009. the total available electricity was 47,009 GWh, while transmission capacity delivered 45,093 GWh.

 

 

Structure of ELECTRIC ENERGY transmission

(input – output in ЕЕС, 2009)


• The EPS Thermal Power Plants have injected into the system the total of 25.018 GWh
• The EPS Hydro Power Plants have injected into the system the total of 10.996 GWh
• The total of 5.184 GWh has been withdrawn from the neighboring systems
• The total of 6.532 GWh was injected into the neighboring systems in 2008
• The number of employees as of 31/12/2009 was 1.355 employees
• Based on this number of employees, in 2009, the transit of 29,59 GWh/worker was realized

 

 

 

TRANSMISSION LOSSES (2009)

The total loss rate in 2009 was 2,68 %, on all voltage levels (400 / 110 кW)

* Without Kosovo

 

 
top