The Regional Transmission Center "NOVI SAD" transmits the electric energy and performs the maintenance of transmission capacities in the region of Vojvodina.
The organization of jobs that cover use and maintenance of transmission capacities is aimed at providing a continuous high level operational readiness of the facilities in order to assure the appropriate safety in transmission of the available amounts of the electric energy.
The electric energy transmission is carried out by:
| SUBSTATIONS |
| 400X/ KV |
220X/ KV |
110X/ KV |
TOTAL |
| Number |
Power MVA |
Number |
Power MVA |
Number |
Power MVA |
Number |
Power MVA |
| 4 |
1.700 |
2 |
1.100 |
|
20 |
6 |
2.820 |
| POWER LINES |
| 400X/ KV |
220X/ KV |
110X/ KV |
TOTAL |
| 486 km |
306 km |
1324 km |
2.116 km |