Transmission Department

 

 

ELECTRIC ENERGY TRANSMISSION DEPARTMENT transmits the electric energy produced in the power plants to distribution companies and big industrial consumers, interconnets the power system of Serbia with other power systems thus enabling the import, export and transit of electric energy.

The above objectives are achieved owing to 90 high-voltage substations with the total installed capacity of 15.840 МVА, interconnected by 110 kV, 220 kV and 400 kV power lines whose length is 9.864 кm.

Along with the market placement of the produced electric energy, as well as the entire energy exchange and transit, during 2006, 45.834 GWh was transmitted with losses amounting to 2,75 %.

In order to execute its tasks as efficiently as possible, the Electric Energy Transmission Department is organized on the regional basis. The electric energy transmission at the territory of Serbia is performed in the Regional Transmission Centres.

- Technical Unit
- TC Belgrade
- TC Bor
- TC Valjevo
- TC Krusevac
- TC Novi Sad
- TC Obilic
 

All technical tasks and those aimed at the improvement of the transmission activity in the Regional Transmission Centres are wholy carried out in the Unit for technical operations called ''TECHNICAL UNIT''.

''Elektromreža Srbije'' is connected to almost all neighbouring power systems through 400 kV tie lines.

 
 